Several construction methods of dozer

l. Downhill bulldozing France
To increase the number and depth bulldozer shoveling earth, improve production efficiency, pushing mounds, backfill the trench, the can be used.
2. Concentrated batches, one push method
The harder the soil, the soil depth of cut is small bulldozer, a small shovel earth, concentrated in batches, and then pushed to the unloading bulk soil area. This method allows the blade to push the number to increase, reduce transportation time and improve productivity.
3. tied bulldozing France
In the formation of a larger area of ​​the construction site, the use of two or three parallel dozer bulldozer. Each bulldozer dozer will generally increase the amount by 20%. When tied dozer, blade pitch of 15 ~ 30cm. Tied for the number of units should not exceed four.
4. Bulldozing a trench method
The first is pushed along over the original slot dozing, soil ridge formed by the previous bulldozing can prevent soil loss, thereby increasing push traffic. This method can be concentrated in batches, use a push method combined.
5. Bevel bulldozing law
The ramp is mounted on the blade holder, and the horizontal axis to form a certain angle bulldozer dozing in the horizontal direction. Generally when trench backfill and no room for parking, use this approach.